About Us
Recent times have seen the rise of nations that have excelled in the provision of infrastructure and subsequent development in the form of road networks linking mega projects such as industrial zones,
medical facilities, educational institutions, and residential areas thereby providing excellent facilities for its people. Saudi Arabia is one such modern miracle that developed exponentially in the last few decades.
We, at East Gate, have for the last Forty-four years, tried to do our little bit for our beloved country, in the fields of civil Contracting and related projects. With our management team of highly qualified
staff to cope with the fast-changing requirements of the industry, we have earned a reputation for excellence and professionalism. The long list of our prestigious completed projects speaks volumes about the quality of our work as well as the timely completion to the total satisfaction of our esteemed clients.
Results produced by the hard work of my team spanning a period of more than three decades inspires me to offer with confidence our best services to deliver on any of your future project more than your expectations.
Engineering Services
General Fabrication
Duct Fabrication / Installation
Pipeline Insulation and Fabrication
Tank Fabrication
Machine Shop Engineering
Aluminum Fabrication
Equipment Installations
Painting
Industrial Equipment
Our Methods
- Planning and Design: Surveyor staking foundation location
-
Excavation: If necessary, clearing and tree removal
-
Launch: footing and foundation work, framing and
roofing, and flashing work
-
Rough-ins: electrical, plumbing, others
-
Finish Work: Interior trim, doors, floors, cabinets,
windows, paintings, etc.
-
Final Inspection: Punch list, current and water flow
Safety Control Program
Safety in the workplace is of paramount importance to the rank and file of this organization. Detailed security instructions are in place spelling out the Standing Operating Procedures to be implemented to ensure the safety of
all concerned.
Regular training is imparted to the concerned staff in the following areas:
-
General safety in the site area as well as the offices.
- Proper signboards highlighting the safety procedures.
- Prohibition of unauthorized combustible material.
- Availability/use of protective clothing such as steel helmets and boots, etc.
- Availability of all required safety equipment such as fire extinguishers.
- Deputation of qualified personnel assigned to safety duties. Periodic safety inspections by the Project Manager.
- Quick reporting to Management in case of accidents
- Easy access to proper First Aid.
- Availability of vehicles for quick evacuation of casualties.
- Regular rehearsals of SOPs to be followed in case of accidents.
Quality Control Program
Introduction
East Gate provides construction & engineering services throughout Saudi Arabia. East Gate initially provided resource management and engineering services to industrial developments.
Since this time, the company has evolved into a full service Prime Contracting
firm providing a wide variety of construction services to industrial, commercial, institutional and multi-residential projects. We possess the unique in-house ability to self-perform structural, concrete, civil, site service piping and
engineering services. We have the capability to approach projects either on a design stand alone construction / installation basis.
Quality System
General
The quality manual shall be implemented to produce a product that conforms to the project requirements and enables East Gate to
create and retain satisfied customers.
With the effective implementation, the overall performance efficiency will be improved, thereby minimizing unproductive time.
Quality system procedures
Each activity for the project shall be monitored and inspected for quality.
A Checklist is prepared that addresses the various quality requirements for each material during the stages of production, delivery and installation. The documentation of work activity and product quality shall serve as a basis for evaluation and acceptance of the project.
Quality Planning
East Gate shall do the following:
Plan for pre work meetings to address quality procedures and other requirements pertaining to achieving quality products.
Use of the prepared checklist shall serve as a tool to check items for quality requirements. The checklist shall serve as a quality document when “signed off” by the QC Manager or QC Inspector.
Use only approved plan; quality procedures; equipment for quality testing. Ensure that the product quality shall be consistent with other quality requirements in the project during the stages of production, delivery, installation and testing. Review undertaken to ensure compatibility between contract documents, construction drawings and other project specifications.
Assess and update as necessary the existing quality control procedures, inspection and testing techniques. Review the contract documents and identify items needing verification.
Clarify with the Owner and its Sub-contractors items in which the acceptance requirements were not adequately specified in the Contract documents.
Prepare quality records and keep on file for use. Any new records needed to satisfy the contract requirements should be identified and prepared